Technical Design & Building Warrant

RIBA Work Stage E-F
(Circa 12 weeks)

  • Preparation of technical design(s) and specifications, sufficient to co-ordinate components and elements of the project and incorporation of building standard information.
  • Co-ordination with structural engineer to incorporate any structural information within the technical drawings and specification.
  • Submission of drawings and technical information for building warrant application.